Speeds Up The Disaster Area Industry Reconstruction
September 4th 2010 Posted at Uncategorized
0 Comments
Because completes the disaster collapse and the serious damage agriculture room reconstruction duty basically, guaranteed that the disaster-stricken people move in the new home by the end of this year. Speeds up the earthquake disaster area school to resume the construction, guaranteed that at the end of this year 95% above students can study in the permanent school building. Continues to advance infrastructures and so on transportation, correspondence, energy, water conservation to resume the reconstruction. Does well the geological disaster to prevent and control, the ecology repair and the disaster destroys the farming secondary ploughing. The union implementation key industry adjustment promotion plan, speeds up the disaster area industry reconstruction and the development.